top of page
Search

Heat Pump Grants Scotland 2026: The Complete Decision Guide

  • Writer: Cameron
    Cameron
  • 19 hours ago
  • 12 min read

If you have been researching heat pump grants in Scotland, you have almost certainly encountered the same recycled advice. Every website lists Home Energy Scotland, mentions a £7,500 grant, shows a stock photo of an outdoor unit, and invites you to fill in a form. Very few explain the actual eligibility requirements, the realistic costs once the grant is applied, or whether a heat pump even makes sense for your specific property.


The grant landscape is shifting. ECO4 is being wound down. The Warm Homes Plan is coming but details remain thin. And a surprising number of households assume they will get a heat pump for free, only to discover they do not qualify for funded routes at all.


This guide cuts through the noise and helps you answer the question that actually matters: can you get a funded heat pump, and if not, does self-funding stack up for your home? Here is what we will cover:


  • A clear eligibility breakdown for every current funding route (with the real requirements)

  • An honest look at who heat pumps are and are not right for in Scotland

  • Realistic cost and running figures based on current energy prices

  • The questions your installer hopes you will not ask

  • A practical timeline from enquiry to warm house

  • What is happening with ECO4, the Warm Homes Plan, and future funding

Which Heat Pump Funding Do You Actually Qualify For?

Most articles list every possible scheme without helping you determine which one you can actually access. Here is the current reality as of early 2026.


⚠️ Critical Context: ECO4 formally ends in March 2026. The UK Government’s Warm Homes Plan is intended to replace it, but detailed eligibility criteria and delivery mechanisms have not yet been published. If you are reading this after mid-2026, check whether these schemes are still active before acting on this information.


Funding Route

What You Get

Key Requirements

Realistic Availability

Home Energy Scotland Grant

Up to £7,500 grant + £7,500 interest-free loan

Homeowner, existing property, primary residence. Must provide 100% of heating/hot water. MCS-certified installer required.

Available now. Most accessible route for most homeowners.

HES Rural Uplift

Extra £1,500 on top of standard grant (up to £9,000 total)

Property must be in a qualifying rural or island location.

Available for eligible rural homes.

ECO4

Up to 100% of cost as part of whole-house package

Low income/benefits, EPC D-G, whole-house approach required.

Winding down. Ends March 2026 (possible 6-9 month extension).

Warmer Homes Scotland

Up to £10,000+ for energy measures (heat pump not guaranteed)

Fuel poverty risk, low EPC, specific health/age/benefits criteria. Home must be under 230m².

Available but discretionary. Heat pump not automatic.

0% VAT

Saves £700-£2,000+ depending on system cost

Any homeowner. Applied automatically by installer.

Universal until March 2027.


Home Energy Scotland: The Main Route for Most Homeowners

Unlike the solar panel grant (which was withdrawn in June 2024), Home Energy Scotland still funds heat pump installations. This is the primary route for self-funding homeowners who want to reduce the upfront cost. The grant of up to £7,500 is non-repayable, and you can optionally take an interest-free loan of up to £7,500 on top of that, giving you access to up to £15,000 in combined support.

However, there are conditions that many articles gloss over:


  • The heat pump must provide 100% of your heating and hot water. Hybrid systems (heat pump plus gas boiler backup) are not eligible for grant funding.

  • Replacement heat pumps are not eligible for the grant. If you already have a heat pump and want to replace it, you can only access the interest-free loan.

  • You must be the homeowner, the property must be your primary residence, and it must be an existing (not new-build) property.

  • You need a qualifying energy report recommending the improvements, either from a Home Energy Scotland adviser or a valid EPC.

  • Your installer and the heat pump product must be MCS-certified.


ECO4: Winding Down but Still Available

ECO4 takes a whole-house approach. Rather than funding a single measure, it aims to improve your home’s overall EPC rating. A heat pump might be included as part of a package alongside insulation and other upgrades, but only if it makes sense for the property’s energy performance.

Eligibility requires low income (under £31,000) or qualifying benefits, combined with a poor EPC rating (D-G for homeowners, E-G for renters). The scheme formally ends in March 2026, though the UK Government has consulted on extending it by 6 to 9 months to ease the transition to whatever comes next.


Warmer Homes Scotland: Not a Guaranteed Heat Pump Route

This scheme is specifically designed for households in or at risk of fuel poverty. It can fund up to £10,000 or more in energy efficiency improvements, and a heat pump may be included, but it is at the discretion of the assessor following a property survey. You cannot apply for Warmer Homes Scotland and specify that you want a heat pump. The scheme decides what your home needs.

Eligibility is tighter: your home must be under 230m², meet tolerable living standards, fall within council tax bands A-F, and you must either be over 75, terminally ill, or receiving qualifying benefits.


The Reality: Most Funded Routes Have Conditions

If you are a homeowner with a gas boiler, reasonable income, and a decent EPC rating, your route is almost certainly self-funding with the Home Energy Scotland grant. That is not a bad position to be in. The £7,500 grant plus 0% VAT means a typical air source heat pump installation that would cost £10,000-£13,000 before support could cost you as little as £2,500-£5,500 out of pocket, or nothing upfront if you use the interest-free loan.


Are Heat Pumps Worth It in Scotland? The Honest Numbers

You will read that heat pumps "work perfectly in Scottish weather" and that they "pay for themselves." Both can be true, but neither is guaranteed. The economics depend on what you are replacing, how well-insulated your home is, and what electricity tariff you are on.


How Heat Pumps Perform in Scottish Conditions

Modern air source heat pumps operate efficiently in temperatures as low as -15°C to -25°C. Average Scottish winter temperatures hover around 0°C to 3°C, well within the comfortable operating range. A typical air source heat pump achieves a seasonal Coefficient of Performance (COP) of around 3.0 to 3.5 in Scotland, meaning it produces 3 to 3.5 units of heat for every unit of electricity consumed.

That efficiency multiplier is the entire business case. Electricity costs roughly four times more than gas per kWh, but a heat pump with a COP of 3.5 effectively divides your electricity consumption by 3.5, making the cost per unit of heat comparable to or better than a gas boiler.


Running Cost Comparison

Based on current energy prices (early 2026), here is how the numbers look for a typical 3-bedroom Scottish home using approximately 12,000 kWh of heating energy per year:

Heating System

Efficiency

Fuel Cost (p/kWh)

Annual Heating Cost

Annual Standing Charge

Gas Boiler (A-rated, 90%)

90%

~6.3p (gas)

~£840

~£105

Gas Boiler (older, 70%)

70%

~6.3p (gas)

~£1,080

~£105

Air Source Heat Pump (COP 3.0)

300%

~24.5p (electricity)

~£980

£0 (if gas meter removed)

Air Source Heat Pump (COP 3.5)

350%

~24.5p (electricity)

~£840

£0 (if gas meter removed)

Oil Boiler

85%

~7-8p (oil)

~£1,000-£1,130

N/A

Electric Storage Heaters

100%

~24.5p (electricity)

~£2,940

N/A

💡 Key insight: The biggest savings come from replacing oil, LPG, or electric heating, not modern gas boilers. If you have an efficient A-rated gas boiler, the annual running cost difference is marginal. The case for switching becomes stronger when you factor in the gas standing charge savings (£105/year if you remove your gas meter entirely), future gas price rises, and the environmental benefit.


Realistic Payback Calculations

Payback depends heavily on what you are replacing and how much grant funding you receive. Here are realistic scenarios for a typical 3-bedroom home:

Scenario

System Cost

After HES Grant

Annual Saving

Payback Period

Replacing old gas boiler (70% eff.)

£10,000

£2,500

~£240-£345

7-10 years

Replacing oil boiler

£11,000

£3,500

~£160-£290

12-22 years

Replacing electric storage heaters

£12,000

£4,500

~£1,960

2-3 years

Replacing A-rated gas boiler (90% eff.)

£10,000

£2,500

~£105 (standing charge only)

20+ years

Note: These figures are indicative and assume current energy prices remain broadly stable. Gas and electricity prices fluctuate, and the gap between them could widen or narrow. If you add solar panels and a battery to the mix, the economics improve further because you are generating your own electricity to power the heat pump.


When a Heat Pump Is Not Worth It

Honest assessment: heat pumps are not the right choice for every Scottish home. Think carefully before committing if:


  • You have a modern A-rated gas boiler that is less than 5 years old. The running cost savings are minimal, and you would be replacing a perfectly functional system. Wait until it needs replacing.

  • Your home has very poor insulation and you cannot or will not upgrade it. Heat pumps run at lower flow temperatures than gas boilers. In a poorly insulated house, they have to work harder, the COP drops, and running costs rise. Insulate first, heat pump second.

  • You are planning to move within 3-5 years. You may not recoup enough to justify the disruption, though a heat pump can add value to your EPC rating and property price.

  • Your property has limited outdoor space. Air source heat pumps need adequate clearance around the outdoor unit for airflow. Listed buildings and conservation areas may have additional planning constraints.

  • You have a very small home with low heating demand. If your annual heating bill is already under £400, the payback becomes unreasonably long.


Current Costs: What You Should Expect to Pay (2026)

Installation costs vary significantly depending on property size, system complexity, and whether you need additional work like radiator upgrades, pipework changes, or a new hot water cylinder.

Property Type

Typical System Size

Full Cost (incl. 0% VAT)

After HES Grant

After Grant + Loan

1-2 bed flat

5-7 kW

£7,000-£9,000

£0-£1,500

£0 upfront

3 bed semi-detached

8-10 kW

£9,000-£12,000

£1,500-£4,500

£0 upfront

4 bed detached

10-14 kW

£11,000-£15,000

£3,500-£7,500

£0 upfront (with loan)

Large/rural property

14-16 kW

£13,000-£18,000+

£5,500-£10,500

Possible residual cost


Additional costs to factor in:

  • Radiator upgrades: £150-£400 per radiator if upsizing is needed (heat pumps run at lower flow temperatures, so larger radiators may be required in some rooms)

  • Hot water cylinder: £800-£1,500 if you currently have a combi boiler and no cylinder

  • Insulation upgrades: variable, but cavity wall insulation (£500-£1,500) or loft insulation (£300-£700) may be recommended or required before installation

  • Underfloor heating (optional): £50-£80 per m². Not required, but heat pumps work most efficiently with it


What Actually Happens? A Realistic Timeline

Getting a heat pump installed takes longer than a boiler swap. Here is a realistic timeline based on current Scottish installations using the Home Energy Scotland grant route.

Week

Stage

What Is Happening

1-2

Initial research

Contact Home Energy Scotland (0808 808 2282) for advice. Request an energy assessment if you do not have a recent EPC.

2-4

Grant application

Submit HES grant application with supporting energy report. Wait for approval.

4-6

Quote gathering

Get 3-4 quotes from MCS-certified installers. Check TrustMark and RECC accreditation.

6-8

Site survey + design

Chosen installer surveys property, checks insulation, radiators, electrical capacity, and outdoor unit placement. Produces system design.

8-10

DNO notification

Installer notifies your Distribution Network Operator. Required for systems over 3.68 kW.

10-14

Scheduling + installation

Wait for installation slot. Installation itself typically takes 2-4 days depending on complexity.

14-16

Commissioning + sign-off

System commissioning, MCS certificate issued, handover and training on controls.

Total time from first contact to warm house: typically 3-4 months. If applying through ECO4 or Warmer Homes Scotland, add 4-8 weeks for assessment and approval before installation scheduling.


Questions Your Installer Hopes You Will Not Ask

These are the questions that separate informed buyers from easy targets. Ask every one of them.


What is your MCS certification number, and can I verify it?

MCS certification is required for your installation to qualify for the Home Energy Scotland grant. Any legitimate installer should provide their number immediately. Verify at mcscertified.com/find-an-installer. If they hesitate or cannot provide it, walk away.


What COP are you basing your savings estimates on?

Some installers quote laboratory COPs of 4.0+ in their marketing. Real-world seasonal performance in Scotland is typically 2.8-3.5 for air source heat pumps. Ask for the Seasonal Coefficient of Performance (SCOP) specific to Scottish climate conditions, not the manufacturer’s headline figure.


Do I need to upgrade my radiators?

Heat pumps run at lower flow temperatures (typically 35-45°C versus 60-80°C for a gas boiler). In some rooms, particularly larger ones with smaller radiators, you may need to upsize. A good installer will do a room-by-room heat loss calculation and tell you exactly which radiators need replacing. If they say “it’ll be fine” without doing this calculation, find someone else.


What happens if the outdoor unit fails in January?

Ask about response times for emergency callouts during winter. Check the manufacturer’s warranty period (typically 5-7 years) and whether the installer offers an extended warranty or service plan. Some cheaper units have limited UK-based service support.


Will I need planning permission?

In most cases, no. Air source heat pumps are classified as permitted development in Scotland, subject to noise limits and placement conditions. However, listed buildings and properties in conservation areas may need consent. Your installer should confirm this before quoting.


What is included in your quote?

Make sure the quote explicitly covers: the heat pump unit, hot water cylinder (if needed), any radiator upgrades, pipework modifications, electrical work, MCS certification, commissioning, and DNO notification. If scaffolding or building work is required for the outdoor unit, that should be listed too.


Have you installed this specific model before, and can I speak to a previous customer?

Installers who do good work are happy to provide references. If they will not, treat that as a red flag.


Air Source vs Ground Source: Which Is Right for You?

The vast majority of domestic heat pump installations in Scotland are air source. Of the roughly 3,000-4,000 heat pumps installed annually across Scotland, the overwhelming majority are air source. But ground source heat pumps have specific advantages for the right property.

Factor

Air Source (ASHP)

Ground Source (GSHP)

Typical cost

£7,000-£15,000

£14,000-£25,000+

Efficiency (SCOP)

2.8-3.5

3.5-4.5

Outdoor space needed

Minimal (wall-mounted unit)

Significant (ground loop or borehole)

Noise

Some external noise (40-60 dB)

Silent (no outdoor unit)

Performance in cold weather

Slight drop in very cold conditions

Consistent year-round (ground temp stable)

Best for

Most homes, especially urban/suburban

Rural properties with large gardens or land

Installation time

2-4 days

1-2 weeks (including groundwork)

For most Scottish households, an air source heat pump is the practical choice. Ground source systems are worth considering if you have a large rural property with available land, particularly high heating demands, or you want the highest possible efficiency and are willing to pay the premium.


What Is Happening with Future Funding?

The funding landscape is in a transition period, and it is worth understanding what is changing so you can time your decision well.


ECO4: Ending, with a Possible Extension

ECO4 formally ends in March 2026. The UK Government consulted in August 2025 on extending the deadline by 6 to 9 months to maintain support during the transition. This extension is primarily about allowing existing projects to complete, not about expanding access.


The Warm Homes Plan: Coming but Unclear

The UK Government has committed £13.2 billion to the Warm Homes Plan, which is intended to replace ECO4 and scale up home energy upgrades significantly. However, as of early 2026, detailed eligibility criteria, delivery mechanisms, and timelines have not been published. The industry is in a holding pattern. The plan is expected to deliver through local authorities and combined authorities rather than through energy suppliers (as ECO did), which represents a fundamental shift in delivery model.


Home Energy Scotland: Continuing

The Scottish Government has confirmed that Home Energy Scotland grant and loan funding will remain available in 2026. This is a separate scheme from ECO4 and is not directly affected by the UK-level changes. For most Scottish homeowners, this remains the primary funding route and there is no indication it is being withdrawn.


0% VAT: Until March 2027

The zero-rate VAT on energy-saving installations (including heat pumps) runs until March 2027, after which the rate reverts to 5%. This is a meaningful saving: on a £10,000 installation, the difference between 0% and 5% VAT is £500.


💡 Timing advice: If you are considering a heat pump, there is no strong reason to wait. The HES grant is available now, 0% VAT runs until March 2027, and the Warm Homes Plan is unlikely to offer more generous terms for standard homeowners than the current HES grant. The main risk of waiting is that the 0% VAT window closes, adding several hundred pounds to your cost.


Popular Heat Pump Brands in Scotland

The most commonly installed air source heat pump brands in Scotland include Vaillant, Mitsubishi, Daikin, and Panasonic. Each has different strengths, and your installer should recommend based on your property’s specific requirements rather than simply fitting whatever they have in stock.


When comparing quotes, look beyond the brand name and check: the warranty period (5-7 years standard, 10+ years on some models), whether there is UK-based servicing, the noise rating of the outdoor unit (important for terraced or semi-detached properties), and the unit’s performance at low ambient temperatures (check the published SCOP data, not just the headline COP).


Conclusion: Your Next Steps

Heat pumps in Scotland are a viable choice for many households, particularly those replacing older or less efficient heating systems. The funding available through Home Energy Scotland makes the economics significantly more favourable than in England or Wales, where the Boiler Upgrade Scheme is the only comparable option.


Here is what matters:

  1. Determine your current heating system and its age/efficiency. This dictates your potential savings.

  2. Check your EPC rating at the Scottish EPC Register (free). If you do not have one, Home Energy Scotland can arrange it.

  3. Contact Home Energy Scotland (0808 808 2282 or homeenergyscotland.org) for a free, impartial assessment.

  4. Get quotes from at least three MCS-certified installers. Verify their accreditation at mcscertified.com.

  5. Ask the difficult questions listed above. Do not accept vague answers on COP, radiator upgrades, or warranty terms.

  6. Factor in the full picture: installation cost minus grant, annual savings, standing charge removal, and the 0% VAT deadline.

  7. Do not rush, but do not wait indefinitely either. The 0% VAT window closes in March 2027.


Get in touch with us here for more details, a property assessment, or to get a quote.


 
 
 

Comments


bottom of page